What the MDR requires
Article 83 requires each manufacturer to plan, establish, document, implement, maintain and update a post-market surveillance system, proportionate to the risk class and appropriate for the type of device. The system is part of the quality management system (Article 10(9)).
It must actively and systematically gather, record and analyse data on the device’s quality, performance and safety throughout its lifetime, draw conclusions, and identify and carry out any preventive or corrective actions.
The PMS plan
Article 84 requires the system to be based on a post-market surveillance plan, whose contents are set out in Annex III, section 1.1. The plan describes how data will be collected and analysed, including:
- Serious incidents, including information from PSURs, and field safety corrective actions.
- Records of non-serious incidents and data on undesirable side-effects.
- Information from trend reporting.
- Relevant specialist or technical literature, databases and registers.
- Feedback and complaints from users, distributors and importers.
- Publicly available information about similar medical devices.
It also sets out the methods and indicators used to assess the data, including the thresholds for deciding when a change in frequency or severity of incidents is significant, how complaints are investigated, and the plan for post-market clinical follow-up (PMCF), or why PMCF isn’t needed.
What the findings are used for
Article 83(3) lists where post-market surveillance data must lead. It is used to:
- Update the benefit-risk determination and improve risk management.
- Update the design and manufacturing information, the instructions for use and the labelling.
- Update the clinical evaluation and, for class III and implantable devices, the summary of safety and clinical performance.
- Identify needs for preventive, corrective or field safety corrective action.
- Find ways to improve the device's usability, performance and safety, and detect and report trends.
Reports and deadlines
| Output | EU MDR | Great Britain |
|---|---|---|
| PSUR | Class IIb and III yearly; class IIa at least every 2 years (Article 86) | Yearly by default; class IIa every 2 years (regulation 44ZM) |
| PMS report | Class I, updated when necessary (Article 85) | Class I, at least every 3 years (regulation 44ZL) |
| Serious incident | Immediately once a causal link is established, and within 15 days | The same: within 15 days (regulation 44ZH) |
| Death or unanticipated serious deterioration | Within 10 days | Within 10 days |
| Serious public health threat | Within 2 days | Within 2 days |
Trend reporting (Article 88) covers statistically significant increases in non-serious incidents or expected side-effects that could affect the benefit-risk analysis.
How Psurio helps
Common questions
- Is post-market surveillance the same as vigilance?
- No. Vigilance is reporting serious incidents and field safety corrective actions to the authorities on fixed deadlines. Post-market surveillance is the wider, continuous collection and analysis of data on the device, which includes what vigilance finds.
- Do legacy devices still certified under the old directives need MDR post-market surveillance?
- Yes. Article 120(3) of the MDR applies its post-market surveillance, market surveillance, vigilance and registration requirements to legacy devices too, even while their certificates remain valid.
- How much post-market surveillance is enough?
- The MDR asks for a system proportionate to the risk class and appropriate for the type of device. A class III implant needs far more than a class I instrument, and the plan should explain the choices.
Sources
- Regulation (EU) 2017/745 on medical devices (EUR-Lex)(opens in a new tab) · the EU MDR; use the consolidated version for current wording
- SI 2024/1368, the GB post-market surveillance requirements (legislation.gov.uk)(opens in a new tab) · in force since 16 June 2025
- The Medical Devices Regulations 2002 (legislation.gov.uk)(opens in a new tab) · the UK MDR, as amended
Last reviewed 15 October 2026. This guide is general information, not regulatory or legal advice: the legal texts and your notified body or approved body have the final word.